There comes a time in many buildings’ lives at which they are no longer fit for purpose. Whether this is due to environmental damage, ageing, hazardous materials or efficiency, demolition is sometimes the most effective solution.


Done properly, demolition is the quickest and most cost-effective method of clearing a space of land in preparation for future development or a new building.


If you’re planning a demolition, there are a number of elements that should be considered. From permits to demolish and build, to the assessment of surrounding areas, it is crucial that every aspect of the process is thought through properly before the process begins.


Here is Gowrie Contracts Ltd’s guide to the demolition process.


Relevant Permissions

First and foremost, it is vital that the correct permissions are granted before any part of the demolition process begins. In most cases, planning permission is not a necessity when demolishing a building. However, in certain cases, permission from local councils or authorities will be needed before proceeding with demolition.


Fortunately, a professional demolition company will be able to follow the proper channels and paperwork before the project begins.


Location

Another crucial element that should be assessed before commencing with a demolition project is the surrounding environment. Demolishing a building can be hazardous to the local area if the site is not properly prepared in advance.


Wildlife, trees and animals must be kept safe during the demolition and removed from the area while work is carried out. 


At Gowrie Contracts, we do everything we can to minimise the impact of demolition; ensuring the environment is protected during our work is an extremely high priority for us. That’s why we aim to reuse and recycle as much material as possible from buildings we demolish.


Safety

Finally, it is of the utmost importance that the correct measures are taken to ensure the safety of those conducting the demolition as well as those nearby.


Before a demolition takes place, a full risk assessment should be carried out. This is to assess the property and area for any hazards such as mould, unstable structures, lead paint and asbestos. If the building contains asbestos, trained asbestos removal experts will need to remove it before any demolition work can be carried out.


Additionally, it is crucial that any services such as gas, electricity and water are shut off and disconnected from the property before work begins. This is not only to protect the site from leaks and hazards, but to ensure the safety of surrounding buildings and neighbourhoods also.


Gowrie Contracts Ltd: Demolition Experts Scotland

If you are in need of demolition work, asbestos removal or land reclamation in Scotland, look no further than Gowrie Contracts Ltd. With over 30 years of experience in the industry, our team have worked on countless projects in both public and private sectors.


Don’t hesitate, get in touch with us today to discuss your needs!

Construction worker inspecting ceiling roof for asbestos
by Gowrie Contracts Ltd 04 Apr, 2024
It is essential to be vigilant about the potential of popcorn ceiling asbestos at your property and mitigate the health hazards it can pose.
Man on roof working on a solar panel installation
by Gowrie Contracts Ltd 04 Apr, 2024
Considering installing solar panels on your property but concerned about the risk of asbestos? In this blog, we’ll discuss whether it’s possible.
Employer showing other employees a document outlining responsibilities
by Gowrie Contracts Ltd 04 Apr, 2024
As an employer, you have a responsibility to manage asbestos in the workplace. Find out about the relevant rules and regulations in this blog.
Share by: